SUMO DIGITAL

NEW VENTILATION & AIR CONDITIONING SYSTEMS TO NEW STUDIO’S & EDIT ROOMS

LOCATION: SHEFFIELD

PROJECT VALUE: £85,835.00

DURATION: DESIGN PERIOD 2 MONTHS, ON SITE 4 MONTHS.

Following the successful completion of a project for Confetti Media in Nottingham, GAC were asked to get involved with an extremely noise sensitive project in Sheffield which required newly constructed recording studios and edit rooms to have a noise rating no more than 25 dba. Attenuation to the ventilation and air conditioning system was designed and installed by GAC to achieve a 10 dba reduction at 63Hrz comfortably achieving the specification set out by our client.

WORKS INCLUDED

  • Design & Coordinated Drawings
  • Air Conditioning to Studios
  • Ventilation to Studios

Following the successful installation, GAC have been awarded the maintenance for the newly installed ventilation and air conditioning systems to ensure all systems are kept in tip top condition.